<- BACK to Newsletters Home
TiPS Newsletter - June 2006
Case Study:
Mirant Reduces Operator Alarms by 70% Using Basic Alarm
Analysis Leading to Minor Configuration Changes
Mirant's Dickerson Generating Plant is a coal, gas, and oil
fired facility that produces 853 megawatts of electricity,
primarily servicing Montgomery County, Maryland, in the
Washington, DC area. Management at the plant knew that
operators were confronted with too many alarms. The
reams of paper from console printers offered little as a
way to develop a solution.
Mirant implemented LogMateAMS to replace their logging
printers and to provide the ability to fully evaluate site
alarm activity. The site-wide archive and unlimited, thinclient
access proved critical to the effort, providing every
member of the project team access to meaningful data
and useful evaluation tools.
Analysis showed that many of the alarms being displayed
to operators had nothing to do with operations, they were
maintenance alerts. Following a more thorough evaluation,
the data confirmed that almost 70% of the alarms
displayed on the operator consoles were actually
maintenance messages.
Read
the entire article here (59k PDF)
Rationalizing Alarms with the Alarm Knowledge Base
The LogMate AMS Alarm Knowledge Base (AlarmKB) simplifies the process of reviewing alarm settings through easy, desktop access to a tool where alarm configuration can be reviewed, commented, changed, and approved. LogMate AMS AlarmKB is an integrated part of the AMS suite, accessed by a single click from the thin-client browser interface. The KB displays a grid of all system Tags and alarms. Selecting one will display a completely customizeble form for entry of comments, engineering notes, areas and severity of alarm importance, and any other pertinent data. Information can be shared among an alarm design team, resulting in a projected change to the system. Changes can be reviewed and accepted or rejected, creating an audit trail of alarm system evolution.
Read an
Application Note and
Data Sheet about the Alarm KB on
tipsweb.com.
Plant Performance Seminar - "Golden Triangle",
TX
Squeeze more from your assets by combining alarm management
and loop performance.
June 22, 2006 - Houston, TX - 9:00am-4:00pm
Improve Plant Performance More Quickly and Easily with
Integrated Alarm Management and Plant Performance Monitoring
Coming to the Golden Triangle, Texas (Orange, Beaumont, Port Arthur, Port Neches, Bridge City), a one-day seminar covering integrated alarm management and plant
performance monitoring. Come learn techniques that will improve
your ability to safely reach plant performance goals by enhancing
alarm quality, operator focus, and loop stability. Learn the
unique ways to combine alarm and loop performance data to
speed diagnosis of plant and operations troubles.
Presenters include:
- TiPS
- ExperTune
- Mustang Engineering
- Top Control
There is no charge for the seminar (and lunch is on
us!),
Click here for more information and to register